We often see pipe fitting bends in our daily life, various shapes of bending bring convenience.
However, how to solve the blockage is still a problem. Some users do not operate according to the regulations or use improper methods, resulting in oil contamination on the pipeline. In addition, the service life of the pipe fitting bend is shortened due to the untimely treatment. Here is the correct solution:
1.Prepare some hot water,add a little washing powder,stir evenly,and then enter the elbow to wash away the oil stain.
2.Dredge with baking soda, add baking soda, add hot water to decompose oil.
3.Use grease cleaner, spray on the oil, and then rinse with water. It is recommended to clean and dilute with mild detergent. Before using, it is recommended to know the raw material of the pipe fitting bend before deciding to use it.
Product Detailes
O.D. | Seamless: From 1/2" up to 24" DN15-DN600 Welded: From 26" up to 80" DN650-DN2000 |
W.T. | Sch10, Sch20, Sch30, Sch40, STD, Sch80, XS, Sch120, Sch160, XXS |
Bending Radius (R) | R=3D 4D 5D 6D 7D 8D 9D 10D. |
Bending angle (θ ) | 15o 30o 45o 60o 90o 135o180o, and also could manufacture according to the angles given by the clients. |
Straight Length (L) | The length between two ends general from 300mm-1500mm, and also can produce according to the clients' requirement to product. |
Material | A234-WPB, A420-WPl6, A234-WP11, A234-WP5, A403-WP304, A403-WP304L, A403-WP316, A403-WP316L, SS304, SS304L, SS316, SS316L |
Application Standard | ASTM B16.9, ASTM B16.11, ASTM B16.28, JIS B2311/2220, DIN2617/2616/2615/2391 |
Forming | Hot formed, cold drawn |
Type | Seamless and Welded, LR & SR |
End | Bevel, plain, thread, socket |
Surface Treatment | 1) Sandblasting 2) Paint black lacquer or transparent oil on surface to prevent corrosion |
Application | Petroleum industry, refinery company, fertilizer industry, power station, shipbuilding, onshore platform. |
Packing | 1) Seaworthy wooden box for fittings with size from 1/2" ~ 14" 2) Seaworthy wooden pallet for fittings with size above 14" 3) According to the packing requirement of clients |
Weight | Weight (kg)=[0.0433(d-t)trθ ]/100000+l(the weight of two ends straight bend) |
MOQ | 10 piece |
Delivery Term | FOB(30% down payment in advance, the balance before shipment) CIF or C&F(30% in advance , the balance against with the copy of B/L) |
Delivery time | 15~30 days after receipt of advanced payment |