Four quality inspection aspects of pipe fitting elbow

Views : 464
Update time : 2020-08-19 10:43:26

  The carbon steel pipe fitting elbow must be inspected at the welded joint, which is also an important measure to ensure the welding quality. When the carbon steel pipe fitting elbow is finished, the weld is tested according to the technical requirements of the product. If the defect is not in conformity with the technical requirements, it should be repaired in time (if the serious unqualified can not be repaired directly). The common inspection of carbon steel pipe fitting elbow quality includes three aspects: appearance inspection, NDT and mechanical performance test. These three are complementary to each other, among which NDT is the main one.

  1, appearance check: generally observe with the naked eye, sometimes observe with 5-20 times magnifying glass. Surface defects can be found through weld inspection.

  2. NDT: detect defects such as slag, blowholes and cracks hidden inside the weld. At present, the most commonly used are X ray inspection, ultrasonic testing and magnetic flaw detection. X ray inspection is the use of X ray for weld photography, according to the film image to determine whether there are defects, defects and types.

  3, hydraulic test and pressure test: for pressurized containers requiring sealing, pressure tests and air pressure tests should be carried out to check the sealing and pressure capacity of the weld.

  4. Mechanical performance test of elbow: nondestructive flaw detection can detect inherent defects of weld, but it can not explain the mechanical properties of metal in weld heat affected zone.

Related News
Read More >>
The connection method and interface type of stainless steel pipe fittings reducer The connection method and interface type of stainless steel pipe fittings reducer
Apr .26.2024
There are many connection methods for ASTM B16.9 ASTM A403 WP 316L Stainless Steel Concentric Butt Weld Reducer
Shengtian Group successfully participated in the Russian Oil and Gas Exhibition Shengtian Group successfully participated in the Russian Oil and Gas Exhibition
Apr .23.2024
From April 15th to 18th, 2024, the Oil and Gas Exhibition will be held in Moscow, the capital of Russia.
Production process of stainless steel tees Production process of stainless steel tees
Apr .19.2024
ASTM B16.5 ASME A403 WP 304 Butt Weld Equal Stainless Steel Equal Tees are fittings used for branch pipes, used to manufacture seamless steel pipe tees.
ASME B16.9 Stainless Steel Elbow Dimension ASME B16.9 Stainless Steel Elbow Dimension
Apr .17.2024
We are high quality 90 Degree ASME B16.9 ASME A403 WP304 4 Inch Butt Weld Stainless Steel Elbow manufacturer in China.