  With the rapid development of domestic and foreign pipeline construction, the carbon steel flange blind plate has become an indispensable and important part of the pipeline pressure test. Before and after the pressure test, each section of the pipeline must be cleaned by passing the ball, usually 4-5 times. Especially after the pressure test, it is difficult to clean the water stored in the pipeline, and the cleaning times will be more. The construction method of repeatedly welding the head at the ball receiving place has the following problems: first, increasing the labor intensity of workers; Second, the repeated welding head method has high consumables, requires many times of large-scale equipment and high cost. In view of the problems of high labor intensity, high consumables, many times of large-scale equipment and high cost caused by the repeated welding head method at the launching point when the ball cleaning is carried out after the pressure test of long-distance pipeline, a new simple quick opening large-scale flange blind plate construction method is proposed. Before the measurement of carbon steel flange, certain preparations shall be made, and the measurement shall be carried out according to certain ways and methods. Different measurement methods shall be determined according to specific conditions to ensure the accuracy of measurement.

  Preparation before measurement:

  1. before measurement, according to the position of the large flange, the sketch of each connecting large flange of the equipment shall be drawn and numbered continuously, so that the fixture can be installed in a certain way and principle to ensure normal use.

  2. during installation, the carbon steel flange may have different outer diameters, staggered joints and unequal gasket thickness, so the machined fixture should correspond to the carbon steel flange on the side and cannot be interchanged. Therefore, measuring the size and number of each part is the key to fixture processing and installation

  3. when measuring, it is better to arrange three people, two of whom measure, one of whom proofreads and fills in the form, and the measuring tool is vernier caliper. If there is no condition, the external caliper and steel ruler can be used Measurement is a meticulous work and a prerequisite for fixture installation. Measurement and recording must be prepared without error and the form must be filled out carefully and clearly In the actual measurement work, we should cooperate with each other and be able to cooperate and use according to the correct principle.

Related News
Read More >>
DIN 2630 PN2.5 Weld Neck Flange Dimensions DIN 2630 PN2.5 Weld Neck Flange Dimensions
Nov .24.2026
  DIN 2630 PN2.5 Weld Neck Flange from Hebei Shengtian Pipe-Fitting Group Co., Ltd. is precision forged per DIN standard. It features reliable sealing, suits low-pressure piping for water, gas and general industrial pipelines. Strict inspection guarantees stable quality for global projects.
DIN 2576 PN10 Slip On Flange Dimensions DIN 2576 PN10 Slip On Flange Dimensions
Nov .19.2026
DIN 2576 PN10 slip on flange is one of our core forged products at Hebei Shengtian Pipe-fitting Group. Fabricated to DIN 2576 specification, this slip-on flange is rated PN10, ideal for low-pressure piping connections.
DIN 2573 PN6 Slip On Flange Dimensions DIN 2573 PN6 Slip On Flange Dimensions
Nov .17.2026
DIN 2573 PN6 Slip On Flange is a popular slip-on plate flange following the DIN 2573 standard for low-pressure piping applications, rated for a nominal working pressure of 6 bar.
DIN 2545 PN40 Slip On Flange Dimensions DIN 2545 PN40 Slip On Flange Dimensions
Nov .12.2026
Hebei Shengtian Pipe Fittings Group Co., Ltd. supplies premium DIN 2545 PN40 Slip On Flanges