Hot pressing technology of pipe fitting cap

Views : 456
Update time : 2020-09-08 14:37:42

  For the pipe fitting cap of the hot-pressing, its initial temperature is 930-950 C hot-pressing temperature, the final pressure temperature should not be lower than 850 C, if the temperature dropped to close to 850 C still can not be pressed molding, should be quickly back to the furnace after heating and pressing. In order to avoid the decrease of bonding strength and corrosion resistance of clad steel sheet, the heating time should be shortened as far as possible. The holding time should be controlled within 20 minutes and the reheating times pipe fitting caps should not exceed 2 times. The workpiece should be heated rapidly or cooled at 550~850 C.

  (1) In order to raise the heating speed of the workpiece and ensure uniform heating, the workpiece must be heated to 380 C before entering the furnace. The other workpieces should not be heated at the same time in the furnace, and the workpiece can reach 930 950 C within 15 minutes by properly adjusting the injection rate.

  (2) heating the workpiece at the same time, preheating the die to 450~550 C.

  (3) When the workpiece is discharged from the furnace, the preheated die is placed in the position of the press, and then the workpiece is quickly sent to the die for pressing. The cooling rate of the workpiece is slowed down by the heat of the die. Pipe fitting caps is controlled within 3 minutes from discharging to pressing to ensure that the final pressure temperature is higher than 850 C.

  (4) starting from 380 degrees centigrade and heating to 930~950 C, the workpiece can be released from 930~950 C.

  (5) In order to avoid the intergranular corrosion tendency of the cladding material, two large fans of 600-800mm can be used to blow the workpiece at the same time after the workpiece is pressed and formed, so that pipe fitting caps can be reduced to below 550 C within 3 minutes.

Related News
Read More >>
Shengtian Group successfully participated in the Russian Oil and Gas Exhibition Shengtian Group successfully participated in the Russian Oil and Gas Exhibition
Apr .23.2024
From April 15th to 18th, 2024, the Oil and Gas Exhibition will be held in Moscow, the capital of Russia.
Production process of stainless steel tees Production process of stainless steel tees
Apr .19.2024
ASTM B16.5 ASME A403 WP 304 Butt Weld Equal Stainless Steel Equal Tees are fittings used for branch pipes, used to manufacture seamless steel pipe tees.
ASME B16.9 Stainless Steel Elbow Dimension ASME B16.9 Stainless Steel Elbow Dimension
Apr .17.2024
We are high quality 90 Degree ASME B16.9 ASME A403 WP304 4 Inch Butt Weld Stainless Steel Elbow manufacturer in China.
The processing method of flanges The processing method of flanges
Apr .15.2024
Forging method. Machining flanges through forging can be divided into two types: free forging and die forging. Free forging involves compression processing under a forging press