The production process of DIN 2615 Seamless Pipe Fitting Buttweld Carbon Steel Tee

Views : 40
Author : admin
Update time : 2024-01-12 15:14:23

  In order to manufacture various specifications of high-quality Pipe Fitting Buttweld Carbon Steel Tee with smaller power equipment, the production process of Pipe Fitting Buttweld Carbon Steel Tee involves making the pipe blank into a torpedo shape and opening a small hole in the middle. After heating the pipe blank to forging temperature, it is placed between an upper mold and a curved lower mold. While the upper mold applies radial pressure on the pipe blank, a pulling block installed inside the hole is used to stretch it at a rate along the axial direction of the small hole to form it.

  A high-pressure tee for petroleum drilling and production engineering construction operations and production sites is composed of DIN 2615 Carbon Steel Tee body, a connecting pressure cap, a tee lower body, a side pipe, a high-pressure valve group, and pressure control screws. The DIN 2615 Carbon Steel Tee body is connected to the lower body of the DIN 2615 Carbon Steel Tee through the connecting pressure cap, and one side of the tee body is inclined downwards and welded with a side pipe connected to it.

  Due to its novel structure and flexible and convenient operation, the DIN 2615 Seamless Pipe Fitting Buttweld Carbon Steel Tee can reduce wear on the connecting steel pipes, extend their service life, reduce production costs, and solve the problem of workers working under pressure, which is beneficial for production.

Related News
Read More >>
The connection method and interface type of stainless steel pipe fittings reducer The connection method and interface type of stainless steel pipe fittings reducer
Apr .26.2024
There are many connection methods for ASTM B16.9 ASTM A403 WP 316L Stainless Steel Concentric Butt Weld Reducer
Shengtian Group successfully participated in the Russian Oil and Gas Exhibition Shengtian Group successfully participated in the Russian Oil and Gas Exhibition
Apr .23.2024
From April 15th to 18th, 2024, the Oil and Gas Exhibition will be held in Moscow, the capital of Russia.
Production process of stainless steel tees Production process of stainless steel tees
Apr .19.2024
ASTM B16.5 ASME A403 WP 304 Butt Weld Equal Stainless Steel Equal Tees are fittings used for branch pipes, used to manufacture seamless steel pipe tees.
ASME B16.9 Stainless Steel Elbow Dimension ASME B16.9 Stainless Steel Elbow Dimension
Apr .17.2024
We are high quality 90 Degree ASME B16.9 ASME A403 WP304 4 Inch Butt Weld Stainless Steel Elbow manufacturer in China.